Fleet changelogs ยท dev.ecs0.net
rdmpw3275m-changelog-20260911-2032-tyrell-build19-pass3-memory-transient

rdmpw3275m-changelog-20260911-2032-tyrell-build19-pass3-memory-transient

Tyrell Build 19 remained healthy through unchanged inventory pass 3, but the pass produced a reproducible six-to-seven-minute charged-memory plateau near 801 MiB before reclaiming to 107.5 MiB; this materially extends the existing inventory and memory-gate issues without yet constituting a gate failure.

Scope and state

Pass 3 evidence

Interpretation and gate risk

Commands and state changes

Rollback and outstanding work