rdmsm4x-changelog-20260830-2151-portfolio-readonly-reconciliation
rdmsm4x — changelog — portfolio read-only reconciliation — 2026-08-30 21:51 EDT
Resumed only the portfolio read-only receipt, count, and packet reconciliation after Codex restart; preserved all source, recovery, and active-writer boundaries.
Scope
- Canonical coordination task:
01a05576-551e-7502-af54-bd854b1e56aa. - Control root:
/Users/richh/dev/fleet/portfolio-consolidation. - No product source, project packet, recovery holding, remote host,
task store, provider state, credential, mutable
.gitdirectory, ref, archive, or deployment was changed.
Verified
- Portfolio control root is branch
codex/portfolio-consolidation-20260823at4db6e080565d34da25c3acb54bc31be16b69db56, with 16 modified files and+241/-36;git diff --checkpassed. No active portfolio-owner check-in claims the delta. inventory/project-catalog.jsonremains a 44-project, 2026-08-23 generated catalog. The 2026-08-29 ledger records 382 repository records, 271 distinct common-Git roots, and 106 dirty roots, while its source handoff reports 272/101. Neither count is completion or fan-out evidence pending a declared grouping rule.- The
dev-dataroo-netpacket names/Users/richh/dev/sites/dev.ecs0.netas canonical source, requiring an owner alias/route disposition before any packet change. - The
rdmbair13m5Tyrell continuity receipt remains received/checksummed/bundle-verified but not accepted or integrated. Whole-manifest verification has five mismatches limited to reconstructed mutable Git-index paths. No artifact was regenerated or repaired.
Coordination
- Sent
20260830-215124-6BBBB989toclaude@rdmsm4x, requesting four explicit owner decisions: portfolio worktree writer/disposition; inventory/catalog authority and grouping rule; dev-dataroo-net alias route; and Tyrell receipt retention versus separate immutable-artifact verification. - ReplicantDB and LogTTY remain under their current dirty active-writer/do-not-ship boundaries and were not touched.
Next action
- Wait for the named owner decisions. Only then may the designated lead carry out a narrow packet/count action; source movement, merging, task fan-out, archive, or repair remains out of scope.
Undo
- This was read-only aside from this changelog and the immutable coordination message. Retain both as audit evidence; no project rollback is required.